Minutes of the regular meeting of the Georgetown Township Planning Commission, held Wednesday, May 17, 2006

 

Meeting called to order by Chairman Honderd at 7:30 p.m.

 

Present:           Honderd, Poskey, DeGood, South, Stasiak, Huizinga

Absent:            Pearson

 

#060517-01 - Agenda for May 17, 2006

 

Moved by South, seconded by DeGood, to approve the agenda for May 17, 2006, as presented.

 

MOTION CARRIED.

 

#060517-02 - Minutes of the April 19, 2006 regular meeting and the May 3, 2006 work

session meeting

 

Moved by Stasiak, seconded by DeGood, to approve the minutes of the April 19, 2006 regular meeting, as submitted.

 

MOTION CARRIED.

 

Moved by South, seconded by DeGood, to approve the minutes of the May 3, 2006 work session meeting, as submitted.

 

MOTION CARRIED.

 

#060517-03 – Unfinished Business- Planned Unit Development (PUD0601) Riverview Trails

 

The applicant has obtained an additional 12 acres and the materials have been forwarded to the planner for a review.  Notice for the public hearing has not been published.  No action was taken and no site plan was available for review.

 

#060517-04 - Unfinished Business - (ST0602) Jore Retail-2400 Chicago Dr.

 

After the last meeting, the applicant was contacted and he reported that they have decided to not proceed.  Although the withdrawal was requested to be put in writing, nothing had been submitted.  This is the second month under old business. If no new information is submitted and if no revised site plan is submitted addressing the concerns raised by the Planning Commission by the regular meeting in June, the site plan could be denied since it does not meet the requirements of the Planning Commission and it is the PC’s policy to act on items under old business after three months.

 

#060517-05 - Ordinance Amendments Sec. 25.6(A), Chapter 24 footnote (k) and (m)

 

The Planning Commission left the item tabled until the next meeting.

 

 

#060517-06 - Preliminary Plat of Crosswinds, cul de sac

 

Steve Smit, Focus Engineering, represented the applicant and presented the request.

 

The zoning administrator presented a review.  The site is located at the southeast corner of Baldwin and 48th Ave. and the parcels are zoned LDR.  Water is available to the site; however, dry sewer will be installed since sanitary sewer is not available to the site at this time. 

 

SUMMARY

 

a.                   A stub street was provided to the northwest.  A note was added that the property at the northwest of the site could possibly be developed in the future as a PUD with the intention being that the density of 2 to 3 units remain, but with duplexes rather than single family homes.  

b.                  The decel lane has been removed.  Brett Laughlin, Ottawa County Road Commission, indicated that the Road Commission preferred that the decel lane be removed since this area would be widened into five lanes in the future.   

c.                   A note was added regarding the removal of the existing driveway and sidewalks added.

d.                  The Planning Commission should determine if they want to recommend a variance for the 1,350 lineal feet of road which exceeds both the maximum of 600 for a cul de sac.

e.                   Lot 27 (which is now lot 26 and the number should be revised) no longer shows the building envelop abutting the easement.  A note was added stating that any deck for lot 28 would be within the building envelop so as to not extend into the drainage easement.  However, the lot numbers have been shifted and the lot number should be corrected to read lot 27.

f.                   Note 13 states that lots 1 and 28 do not have access to Baldwin and will maintain the parkways on Baldwin.  The note should be revised to be lot 27.

g.                  The applicant should provide documentation that a plat restriction will require all property owners to hook up to sewer within six months from the time it is available.

 

Following is a summary of items presented at the last meeting.

 

a.                   Radii should be shown on the plan. 

b.                  The temporary cul de sac is shown as 1,350 lineal feet and Sec. 50-51(3)(c.) in the Code of Ordinances allows a maximum length of a cul de sac to be 600 feet.  Sec. 50-52 permits the Planning Commission to recommend a variance and the Board to grant a variance. 

c.                   Lots 27 and 28 show the building envelop right up to the drainage easement.  The applicant stated that any decks constructed would have to be within the building envelop.

d.                  A temporary cul de sac is proposed for the south end of Berens Lane and the decision was made to have the sidewalks installed up to the cul de sac since the Road Commission did not have enough of an easement for the sidewalks to go around the pavement safely.  At such time as the road is extended, the sidewalks would be required for lots 14 and 15.  

e.                   A note should be added to the plan that this existing sidewalk is to be removed.  The driveway to the west of this area should also be noted on the plan to be removed even with note 13.

f.                   A general ordinance was adopted requiring an association to maintain parkways that abut a major street when the lot has no access to that street.  Note 14 states that an association will maintain these parkways (as per direction given to the applicant).  However, after reconsideration, the note could be revised to state that the property owners of lots 1 and 28 will be responsible to maintain the parkways along Baldwin (unless the developer wants an association).  Note 13 states that lots 1 and 28 will not have access to Baldwin.

g.                  According to Chapter 24 footnote (d), dry sewer fulfills the requirement of sewer.  Documentation should be provided that a plat restriction will require all property owners to hook up to sewer within six months of the date that it becomes available.

 

Stasiak said that the determination had been made at the last meeting that the sidewalk should be extended to the cul de sac.

 

The applicant indicated that he had thought that the determination was made to leave them alone since they would have to be removed when the road was widened.

 

Honderd said that development of this property would be best to occur at a time in the future when Baldwin Oaks Campground is developed and the two properties developed as one.  He said that it was common sense that the sidewalk extends to the cul de sac.

 

The chairman opened the public hearing.

 

Linda Kraak, 4700 Baldwin, said that she owns Baldwin Oaks Campground and was initially contacted about the development of Crosswinds.  She said that she would like to sell her property for development and that it made sense to develop the sites together.  She said that they had presented her with three different drawings.  She said that she would like to see the property combined and she could possibly be an investor.

 

Honderd said that the Planning Commission can not require them to buy her property and that the application would be approved if it met the standards.

 

The applicant stated that he is unaware of the discussion that his client may have had and he does not recall any plan ever having a stub street to the east.  He said that they may have modified the plan, but they have asked to press forward with this plan.

 

Linda Kraak said that the plan she saw had a lake in the corner.

 

Honderd said that the plan she saw may have been one with smaller lots and a lake for water detention.

 

The applicant explained that the detention was for the temporary holding of water.

 

Honderd said that a majority of the time the area would be dry.

 

Linda Kraak asked if they could be required to oil the road during development to regulate the dust.

 

The zoning administrator said that the mining ordinance was the only place in the ordinance she was aware of such a requirement.  She said that the Road Commission could be contacted with such a request.

 

Honderd said that the Planning Commission would not handle that.

 

The chairman closed the public hearing.

 

The zoning administrator explained that the Planning Commission could table the request to give the applicant time to explore the possibility of developing the site in combination with the campground.  She explained that the property could not be developed as a PUD since sewer is not available to the site.  The zoning administrator stated that there were a few issues remaining with the plan that still needed to be corrected, including correcting the lot numbers in number 15 in the General Notes and correcting the lot numbers from lots 1 and 28 to lots 1 and 27 in number 13 in the General Notes, and extending the sidewalk to the cul de sac as requested by the Planning Commission.

 

Moved by Poskey, seconded by Stasiak, to table the item.

 

MOTION CARRIED.

 

Poskey said that the sidewalk should be extended to the cul de sac, the two notes should be revised, documentation should be provided for the plat restriction, and tabling will give the applicant time to get together with the owner of the campground.  He said that they should wait to act on the revised plan.

 

Honderd said that he agrees with Poskey’s reasons and that a stub street should be added to the east along with the one to the south.  He said that the Planning Commission should see how the streets layout in regards to the surrounding land.  He said that the purpose of the pubic hearing was to take public comment to get other ideas and other information.

 

Stasiak said that he voted to table the item so that the plan could be cleaned up and revised with the necessary corrections.  He said that he also wanted to provide time for the applicant to talk to their neighbor.

 

The applicant stated that he had talked to Brett Laughlin at the Ottawa County Road Commission and a street stub to the east was not required.

 

Honderd said that sometimes the Township was stricter than the Road Commission.

 

The zoning administrator stated that the Road Commission will go along with Township wishes in such regards.

 

#060517-07 - Other Business - Meijer Pharmacy drive-in window

 

Greg Heath, Meijer, 2929 Walker, said that he was requesting to change the approved site plan to reverse the flow of traffic for the drive-in pharmacy window.

 

Mike Kinstall, Meijer Vice-President of Real Estate, said that this is the first reverse flow they have done and up to half of the prescriptions do not flow through the tube.  He said that there were issues with the customer flow with the entrance and there was significant congestion.  He said that this was not typical stacking associated with a bank or drive-in restaurant.  He said that due to the traffic flow, safety issues with the entrance and the tube not working, they were requesting to remove the tube and reverse the flow of traffic to access the drive-in pharmacy.

 

The zoning administrator said there had been major improvements already made to the site.  She said that she had visited a Meijer store in Holland and drove to a pharmacy drive-in window there.  She said that she had not seen the signage and that she had a difficult time accessing the window.  She said that the revisions proposed for the store in Georgetown Township would provide an easier access to the window.

 

Mike Kinstall stated the following.  The Holland store only allows movement in one direction and their customers learn the system.  There is signage to direct the customer.  U-turns and left turns were not permitted there.  People do not always abide by the signage.  If the flow was changed here it would allow access from all directions.  As previously approved, the customers would have to make their way through the parking lot from the east.  With the proposed revision customers could make the turn from every direction.  Even SUVs would not have trouble making the turn.  Plus there was a concern with congestion.

 

Huizinga said that there was a big improvement.

 

Poskey abstained from all discussion and voting.

 

South said the following.  This was a bad location for the pharmacy window and that the Planning Commission had wanted it moved when they first came for approvals.  He would rather have traffic flow from west to east.  He had been there and this was the best of a bad location and it might be better.

 

DeGood said that this was probably a better alternative. He asked how many cars would use the window per day.

 

Mike Kinstall said that they averaged 28 to 35 per hour during the peak times which were 11:00 am to 1:00 pm and 5:00 pm to 7:00 pm.

 

Stasiak said that he had seen a newspaper article about another Meijer store in Grand Haven. 

 

Mike Kinstall said that they held off on the tube system in Grand Haven and the store in Jenison is the first to have it.  He said that the tube system does not work, but more importantly, the traffic flow does not work.  He said that the choice was to either revise the traffic flow or not have the drive-in window.

 

Stasiak asked if any other stores had a similar traffic flow.

 

Mike Kinstall said that eight stores had a similar drive-up including 3 new stores and four or five stores that had remodeling done or additions.

 

Stasiak said that, as stated at the previous meetings when the plan was first reviewed by the Planning Commission last year, the window should be located in another area further away from the congestion.

 

Mike Kinstall said that Standale, Gaines, Knaps Corner and Cascade had similar setups.

 

Stasiak said that he understood the problem with the tub and their urgency to resolve this issue; however, he said that the Township would be better served if they took more time to thoroughly review the plan and observe the site.

 

Greg Heath said that this was a congested area with the garden center.

 

Mike Kinstall said that the current circulation pattern impacts the main entrance of the store and the garden center more than the proposed revision would because the proposed pattern eliminates one conflict point, but there would still be the garden center traffic.

 

The chairman opened the floor to public comments.

 

One member of the audience asked if they only planned to change the direction and what impact that would have on the structures.

 

Greg Heath said that they would have to change the signage and striping, and that they had previously received approval to go from west to east.  He said that the Planning Commission is in place to look out for the best interest of the community and they were looking out for the best interest of their customers.

 

Mike Kinstall said that they would have to take the tube system out and put a drawer in the window.  He said that curbing would have to be added to create an exit.

 

The chairman closed the floor to public comments.

 

Greg Heath said that they are ready to make the change.

 

Stasiak asked if the decision had to be made tonight because he would like more time to visit the site and review the issue since this was only presented to them a few days ago.

 

Mike Kinstall said that the pharmacy is done and has already been relocated.  He said that they still had to order the window and the problem is that people think that the drive-in window is open.

 

South said that he has been there and this is a bad location, as the Planning Commission had stated when it was reviewed for the first time.  He said that where the pharmacy is located is an area that is too congested and a situation that brought more people to that area should be avoided.

 

Stasiak said that since the tube does not work, there are not many options.  He said that the option existed to not approve the revision.

 

Greg Heath said that if the revision was not approved there would be no pharmacy drive-in window.  He said that the tube was only one issue because by shifting the access to the east, congestion would be relieved and it would improve the plan.

 

Huizinga said that he was in favor of the change.

 

Moved by Huizinga, seconded by South, to approve the general layout and have the applicant return with a more detailed plan.

 

Honderd said that this area was too congested.  He said that they were not qualified to determine the best traffic circulation and they should not make a decision on something that they are not informed.

 

Yeas:   Huizinga, South

Nays:   DeGood, Stasiak, Honderd

Abstained: Poskey

Absent:  Pearson

 

MOTION DEFEATED.

 

Moved by Stasiak, seconded by DeGood, to table the item for more time to evaluation the site and to have the revised plans reviewed by the planner.

 

The applicant was directed to return with a complete site plan for evaluation by the planner.

 

MOTION CARRIED.

 

#060517-08 - Michigan Zoning Enable Act (to be effective July 1, 2006)

 

Highlights of the new act were presented.

 

#060517-09 – Adjournment

 

The chairman adjourned the meeting at 8:50 p.m.