Minutes of the
work session of the Georgetown Township Planning Commission held Wednesday,
July 7, 2004
The meeting was
called to order by Chairman Honderd at 7:30 p.m.
Present: Poskey, Huizinga, Jansma, South,
DeGood, Honderd, Stasiak
Absent: none
The work session,
which formulated the agenda for June 16, 2004, included the following items to
be placed on the agenda, discussion, and action:
I.
Approval of agenda
II.
Approval of minutes of the June 16, 2003 regular meeting and the
July 7, 2004 work session meeting
III.
Unfinished
Business
A. Preliminary
Plat of Hunters Meadows
Ron
VanSingel, Nederveld Associates, represented the applicant and presented the
request. He stated that lot 8 had been
adjusted to meet the ordinance and that one of the eastern border lots had been
removed to bring the lots into compliance.
He said that a notes had been added regarding lot access to Rosewood and
36th Ave. He said that the 66 lot plat would be developed in two
phases and there would be public streets and utilities. He said that sidewalks and streetlights would
be installed according to Township ordinance.
The
chairman opened the floor to public comments.
No one was present to make comments on this item.
Moved
by Poskey, seconded by South, to remove the item from the table.
MOTION
CARRIED.
There
was discussion regarding the letter from the Ottawa County Road Commission that
required the two cul-de-sacs to be connected and that the plat should not be
approved until the issue with the Road Commission was resolved.
Moved
by Poskey, seconded by DeGood, to table the request until the matter with the
Ottawa County Road Commission is resolved.
MOTION
CARRIED.
IV. New
Business
A.
Site Plans-none
B. Public Hearings
1.
Special Use Permits-none
2. Rezonings
a. (REZ0404)
To change from (RR) Rural Residential to (LDR) Low Density Residential parcels
of land described as P.P.# 70-14-16-100-032, located at 3023 Baldwin
The applicant was
not present at the meeting. The planner
said that the requested zoning of LDR was consistent with the Master Plan and
compatible with the surrounding area.
3. Plats
a. Preliminary Plat of Hickory Grove No. 4
Todd Stuive, Exxel
Engineering, represented the applicant and presented the request.
It was noted that Brett
Laughlin, Ottawa County Road Commission, called the Township to stated that the
Road Commission would not permit a street named Arcadia Drive to go in
different directions and it should have a different name when is makes a
turn. This is consistent with a review
from the Fire Department due to addressing and possible confusion. Also, Brett said that the Road Commission
would require a stub to the south for future development. He sent a letter that was distributed at the
meeting.
4. PUD’s
a. (PUD0401) Plaza Partners LLC (Cottonwood
Center), is
requesting a Planned Unit Development for commercial uses, under
Chapter 22, on parcels of land described as P.P.# 70-14-13-300-074 and part of
-071, located at 7517 (7493) Cottonwood
Roger Lamer, W.L.
Perry Associates, represented the applicant and presented the request.
The applicant has
indicated that they plan to redo the site currently called Jenison Plaza. The proposal includes re-facing the existing
building, adding an office addition to the southwest corner of the existing
building and constructing a new building at the northeast corner of the
property, which is the old Checkers site.
They are pursuing the project by applying for a planned unit development
because the application includes requests to have the new proposed building
located on the existing concrete foundation from the former Checkers building,
which would be 69 feet from the centerline of Cottonwood and would encroach
upon the required front yard setback of 90 feet from the center line of
Cottonwood. In addition, footnote l
requires that the front yard be landscaped and not used for parking or
drives. The second issue was to have a
sign larger than the 100 square feet maximum and to include an architectural
feature on top that would match the architectural features on the re-faced
existing building.
The zoning
administrator clarified that the proposed sign could have time and temperature
that would change, but the remaining part of the sign could be an electronic
message center that would not change more than once a day.
The planner stated
that the identification towers should be added to all corners of the
building.
There was discussion
regarding landscaping. The applicant did
not want to obscure visibility of the businesses; however, the Township would
want a minimum as required by the ordinance to mitigate the large asphalt
parking lot.
It was noted that
the applicant has demonstrated that the proposal meets the intent of the
ordinance and has been acting in good faith; however, more landscaping should
be added.
There was discussion
regarding the number of driveway accesses to Cottonwood and a suggestion was
made to eliminate one driveway. The
applicant indicated that the driveway to the north would only be a one-way in
and one-way out. It was noted that the
dumpsters should be noted and screened.
The applicant stated
that the west side was owned by Meijer and they were working with people there
to upgrade the landscaping.
Bill Busey, property
owner, stated that an agreement had been reached with Meijer to have uniform
landscaping in front of this site and the Meijer site.
Roger Lamer stated
that the dumpster would be screened and remain in the indentation area. He said that the loading and refuse pick-up
would be early in the morning and would not interfere with parking. He said that the west side would have a
business-type look.
The applicant asked
to have two less trees than shown on the plan.
The Planning Commission directed that the number of trees be consistent
with the ordinance, but other types of trees could be used such as ornamental,
rather than canopy, for better visibility for the shops.
It was clarified
that the proposal could include a sign other than one that meets the ordinance
requirements if it was approved as part of the planned unit development due to
the fact that PUD’s provided a tool for flexible zoning.
DeGood stated that the
northern most driveway would relieve some traffic congestion from the other
drives.
Jansma stated that
good access management practices could require the one drive across from Church
St. and not permit more. He said that an
access driveway to the former Checkers property was permitted because it was a
separate parcel and had to have its own entrance. He said that having the northern drive with a
right turn in and a right turn out was better than both ways in and out.
Honderd said that it
was good that the site would be cleaned up and the plan for offices on the west
side was also a good idea. He was not in
favor of cutting back on the landscape requirements because the landscaping
would soften the big sea of asphalt.
The applicant said
that using shrubs instead of trees would avoid blocking the businesses.
The planner said
that there were opportunities for different trees with different heights to be
used to meet the requirements without blocking the businesses. He said that the Township was permitting
flexibility with setback requirements, but should not relax landscaping
requirements. He asked if the mature
trees would be relocated. He said that
landscaping should be staggered on the island.
Direction was given
by the Planning Commission to advertise for the public hearing on August 18,
2004, and that revisions were necessary and would be discussed at the next
meeting.
b. (PUD0402) Koetje Builders and Developers LLC, 547 Baldwin, is
requesting a Planned Unit Development for Unity Timbers for residential uses, under Chapter 22, on parcels of
land described as P.P.# 70-14-31-400-030 and 70-14-31-200-060, located at 5101
and 5131 40th Ave.
Ron VanSingel,
Nederveld Associates, represented the applicant and presented the request. He stated that full utilities would be
provided and the opportunity existed to connect to either the City of
Hudsonville or with the Township. He
stated that the plan is consistent with the Master Plan. He said that 20% open space was proposed,
mostly as a pond which would be accessible to all in the development. He said that there would be walking trails
with a gazebo.
He said that the
proposal shows 55 lots for single family homes that meet minimum requirements and
33 duplexes (total of 66 units) on a site condo development area. He said that the plan shows a public street
adjacent to the single family lots and a private street, which still would have
to be constructed according to Ottawa County Road Commission standards,
adjacent to the duplexes. He said that
they were sensitive to the buffer on the side adjacent to the industrial zone
and Hardwood trees existed throughout the property. He said that sidewalks would be provided by
the single family homes and along 40th Ave.
It was noted that
the proposal would be subject to the plat approval process and that plat review
could be conducted simultaneously with the final development plan.
The planner stated
that no architectural information had been provided. He said that the plan does not have a high
degree of innovation and that it did not meet the intention of the PUD
ordinance. He said that the Hardwood
trees did have to be taken into consideration.
He said that the number of units allowed in the Master Plan is 124 and
125 were provide. He said that a
separate landscaping plan should be shown for the greenbelt. He said that no sidewalks were shown along
the private street. He said that the
open space was not provided in a centrally located spot.
There was discussion
regarding sidewalks along the condos and the zoning administrator was directed
to research the issue.
South asked if the
plat would continue to Barry Street and was told that the property owner had no
desire to connect to the plat.
Jansma said that lot
44 was required to have 110 feet of width because it was a corner lot.
Honderd stated that
the street was very long and that elevations were needed because they should be
designed toward homeownership rather than duplexes. He said that the plan lacks imagination and
the road was long and narrow, although he did understand that this was not an
easy piece of property to work with.
The applicant stated
that this was the only place to locate the stub street.
Jansma said that the
state legislates that water could not be considered as open space. He said that the plan shows 85% of the 20% of
open space as water, which is contrary to the Township ordinance and to state
legislation. He said that the required
85 feet of width should be shown to demonstrate compliance with the ordinance.
DeGood said that the
lots should meet LDR requirements.
There was discussion
regarding open spaces and the determination was that the open spaces shown on
the plan were acceptable.
Honderd stated that
the intention of the PUD ordinance was not to just get the density that the
applicant wants. He said that this plan
shows no creativity and he would like to see the design changed. He said that elevations are needed and landscaping
should be shown.
The Planning
Commission directed that the application not be advertised for a public hearing
and that revisions were necessary.
c. (PUD0403) Sunset Manor, 725 Baldwin St., is requesting a
Planned Unit Development for an independent and assisted living
community with associated commons, service area, parking and open space, under
Chapter 22, on a parcel of land described as part of P.P.# 70-14-22-400-006 and
70-14-22-450-001 located at 1751 Port Sheldon
On June 9, 2003, the
Board approved the preliminary development plan for the PUD for Sunset Manor to
construct housing for the elderly on 18th Ave. and Port
Sheldon. The applicants had one year to
return with the final development plan.
The applicant returned to the Township with changes to the approved
preliminary plan that not been determined to be minor. Therefore, the determination was made that
the application must go through the whole process again for the preliminary
development plan.
The proposed changes
include a different footprint for the structures and a different configuration
for parking. Also, additional property was
acquired and the number of units has increased.
The previous plan
proposed 282 total units for housing for the elderly, including 234 independent
living and 48 assisted living units. The
new plan proposes 333 total units for housing for the elderly, including 285
independent living and 48 assisted living units.
Todd Stuive, Exxel
Engineering, represented the applicant and presented the request. He stated that the site has increased by 6.4
acres and the number of units has increase by 51 units, which results in eight
units per acre. He said that they were
working with the DEQ for the wetlands and there are 26.5 acres of open spaces
without the lake. He said that there was
32% of usable open space. He said that
the independent living wing would be four stories, the wing along Port Sheldon
would be three stories, the back area would be four stories, and the central
core area would be one story. He said
that the assisted living wing would be two stories with a court yard. He said that garages had changed from being
located under the individual units to a covered two-level parking garage. He said that the main access would be from 18th
Ave. and a loop to Port Sheldon would provide the service access. He said that sidewalks would be provided
along all frontage roads and a waiver is being requested for the area along
Chicago Dr.
There was discussion
regarding the Fire Department comments.
The planner stated
that sidewalks were required within the development, as well as adjacent to the
streets.
The applicant stated
that sidewalks were provided for interior pathways.
The planner said
that phases and time frames had to be provided.
He said that there were 33 total units, including 285 individual units
and 48 assisted living units. He said
that the plan meet acreage requirement and utilities would be provided. He said that the proposed use was consistent
with the Master Plan. He said that
parking space dimensions and calculations were needed, and one parking space
was required per bed.
South asked about
the water run-off.
The applicant stated
that the pond would help with the whole drainage system and permits are in
place with the DEQ.
John Thorhour,
Sunset Association, stated that the parking study would be the same as for the
last submission. He submitted a copy to
be distributed. He said that a parking plan
was in place for holidays, such as Mother’s Day, and other special events, which
includes an arrangement with Meijer for their parking lot. He said that people would then be bussed in,
including staff, and this helped to avoid building unnecessary parking areas
that would result in a sea of asphalt.
He said that future parking would be shown and would not be added unless
necessary.
The Planning
Commission directed that revisions were necessary and to advertise for a public
hearing for August 18, 2004. The
determination was made that the request would not be added to the July 21, 2004
agenda, but would be added to the August work session.
d. (PUD0404) Final Development Plan (for PUD0302)-Pages in
Time-7359 Cottonwood
The Meijer
(Culver’s) PUD was approved by the Board on 10-13-03. The applicant has returned within the
required 12 month period to apply for a final development phase for the
addition part of the PUD (next to the Culver’s restaurant).
Mark Tomasik,
Innovative Design PC, represented the applicant and presented the request. He said that the retail store would be for
cropping pictures and selling stamps. He
said that the site work had been provided by Meijer and the site box was not
shown.
The planner stated
that he applauded the applicant for a good site design. He said that 72 parking spaces were proposed
and only 70 were required. He said that
the plan meets the qualifying conditions.
He said that there were limited pedestrian connections to other area,
but safe connections could be located elsewhere. He said that the architecture was adequate
and traffic access was existing. He said
that there was an opportunity for additional landscaping along the eastern
area.
Honderd said that it
was too late for a pedestrian bike path along the railroad tracks.
Jansma asked for an
overall PUD plan showing the whole PUD.
The site plan should
be revised to list Georgetown Township instead of the City of Jenison.
5. Ordinance Amendments-none
V.
Other
Business
VI. Commissioner Comments
VII. Staff Comments
VIII.
Adjourn
The meeting was